Bill tracker, H.R. 8113, Water Resources Development

To direct the Secretary of the Interior to carry out a feasibility study on a selective water withdrawal system at Glen Canyon Dam, and for other purposes.

  1. Introduced
  2. In committee
  3. Reported
  4. Passed the House
  5. Passed the Senate
  6. To the President
  7. Became law

Introduced Mar 26, 2026 with 2 cosponsors. Latest action Mar 26, 2026: Referred to the House Committee on Natural Resources.

Sponsor

Committees

Timeline

CommitteeHouseSenatePresidentAprMar 26, 2026: Introduced in HouseMar 26, 2026: Referred to the House Committee on Natural Resources.
PassedFailed, tabled or vetoedBecame lawOther steps

What happened to it

Related bills

Full history

    • ReferredHouse. Referred to the House Committee on Natural Resources.
    • IntroducedIntroduced in House

Read the bill on Congress.gov