Bill tracker, H.Res. 290, Energy

Recognizing that the retirement of nonintermittent electric generation facilities, before facilities with equal or greater reliability attributes are available, is a threat to the reliability of the United States electric grid.

  1. Introduced
  2. In committee
  3. Reported
  4. Agreed to in the House

Introduced Apr 2, 2025 with 1 cosponsors. Latest action Apr 2, 2025: Referred to the House Committee on Energy and Commerce.

Sponsor

Committees

Timeline

CommitteeHouseSenatePresidentMayApr 2, 2025: Submitted in HouseApr 2, 2025: Referred to the House Committee on Energy and Commerce.
PassedFailed, tabled or vetoedBecame lawOther steps

What happened to it

Full history

    • ReferredHouse. Referred to the House Committee on Energy and Commerce.
    • IntroducedSubmitted in House

Read the bill on Congress.gov