Bill tracker, S. 5733

A bill to establish a best-available transmission conductor standard for certain transmission projects under the Federal Power Act and to provide for presumptions regarding cost recovery for such conductors.

  1. Introduced
  2. In committee
  3. Reported
  4. Passed the Senate
  5. Passed the House
  6. To the President
  7. Became law

Introduced Nov 17, 2026 with 1 cosponsors. Latest action Nov 17, 2026: Read twice and referred to the Committee on Energy and Natural Resources.

Sponsor

Committees

Timeline

CommitteeHouseSenatePresidentDecNov 17, 2026: Introduced in SenateNov 17, 2026: Read twice and referred to the Committee on Energy and Natural Resources.
PassedFailed, tabled or vetoedBecame lawOther steps

Full history

    • ReferredSenate. Read twice and referred to the Committee on Energy and Natural Resources.
    • IntroducedIntroduced in Senate

Read the bill on Congress.gov